The report goes out as a PDF on WhatsApp. Daily = every day · Weekly = every Monday ·
Monthly = the 1st. Each row has its own hour. A row with no department gets the whole report.
An automatic send always covers that day — the From/To boxes above are for reading and for Send Now.
Name
WhatsApp mobile
Department
How often
Time
Status
Leave the dates empty for everything on record.
Job work — what went out, what came back
A row counts against the day it went out. Goods return
2.5% short by the rule, so what is owed on a row is 97.5% of what went out and
Pending is measured against that, never against the full quantity. Measured on this
book, every returned row came back within a metre of exactly 97.5%.
Back from job work — and not packed yet
Counted only on the orders that go through job work.
Packing is fed by ordinary production too, so comparing every packed metre against job work
would answer a different question.
Machine production — design by design, planned against actual
Pending
Pending orders — delay agent
Loading…
Stage-wise Delay — which stage goods are stuck at
Loading…
Reports
Pick a report — it downloads from there as PDF (for print) or Excel (for data).
Machine-wise Production
Plan vs Actual, Running Cost and Amount — each machine, as PDF (print) or Excel
PDF (print) · Excel
Quick pick
Machine RPM
Type a new RPM only for the machines whose RPM changed, then press Save all. A machine keeps its RPM until you change it.
An old RPM is never deleted: every change stays in the History below.
From to
Labour charge (for Actual Cost)
Actual Cost = machine fix ₹300 + labour on every day with an entry (Running or Stop) + metres made × yarn + box/polly per metre.
A new labour charge starts from its date; an old one is never changed.
What is in this report?
Each machine's days (ran / stopped / planned), Plan Qty, Act Prod (metres on planned days), Day Prod / Night Prod (typed on Machine Production), Vs Plan % (red Stop for a machine stopped through the whole range),
Actual Cost (fix ₹300 + labour every day + metres × yarn + box per metre, without profit), RPM (Machine RPM above, else Design Master) and Amount (from the order rate, as in MIS).
PDF is for printing: A4 landscape, a heading on every page, readable 9 pt. In Excel every entry goes to the Raw Data sheet and the report is built from formulas. Data stays in cache for 15 minutes;
for fresh figures use ↻ Fresh data.
Braiding / Crochet: the Braiding & Crochet Production entries (one line per head / machine per day), in this same report;
their Running Cost and Amount are n/a (there is no rate).
Attendance Report
Staff Attendance MIS — Present / Absent, Late / On time, Half Day and Day / Night, one sheet per day
PDF (print) · Excel · max 31 days
Up to this many minutes late = On time (company rule: 5)
Arrived later than this many hours, or left this many hours before the shift ends = Half Day
For those with no In Time of their own. Empty = "No In Time"
Quick pick
What is in this report?
Active / Present / Late / Half Day / Absent cards in the MIS layout, the Present Today list (Late red, On time green, Half Day yellow) and the Absent Today list,
both with a Day / Night column. Present = punch-in. Late = punch-in later than the person's own fixed In Time plus grace.
Half Day = punch-in more than 4 hours after the person's own In Time (9:00 shift: after 1 o'clock, 8:00 shift: after 12 o'clock), up to 6 PM;
or left more than 4 hours before the shift ended (9–6:30 shift: out before 2:30 PM, 8–8 shift: out before 4 PM — shown in the Punch Out column);
or a Half Day marked by hand in Salary — counted in Present, not in Late.
Night = punch-in at 6 PM or later (for those who did not punch, their own fixed In Time).
PDF is for printing: A4, each day on a new page, readable 10 pt. In Excel, one sheet per day plus an Info sheet.
Data stays in cache for 15 minutes.
Client Sales
Keep your clients — whose delivery is late, who has gone quiet, who is buying less, who has left — a 2-page report
PDF (print) · Excel
Quick pick
What is in this report?
Goal: keep existing clients. Four figures on the first page — how many clients came back (last 90 days vs the 90 days before),
how many clients have a late delivery, how many are at risk, how many have left — and 4 lists, most important first:
Fix late deliveries (the Stage-wise Delay late rule), Call now (regular clients quiet for twice their usual gap),
Find out why (those buying less) and Win back (no order and no bill for 90 days).
The second page has the Top 10 clients with their status, and the growing clients.
Sale = bill qty × order rate, without GST, on the bill date. In Excel, one line per client with its status ("All Clients").
Data stays in cache for 15 minutes.
Courier Report
Which courier arrived on time, which arrived late, which is still in transit
Screen · PDF · Excel
Kundli and Sonipat too. 2 days = 48 hours
Sunday is not counted. Same days even when City is blank
Quick pick
What is in this report?
Courier Management entries. Days are counted Monday to Saturday (sent Friday, arrived Monday = 2 days).
On time = arrived within its days: metro cities, Delhi NCR (Kundli too) and North India — 2 days; rest of India — 3 days.
The city comes from the City on the courier entry; if City is blank, the rest-of-India days apply. Arrival date = Rec Date — but if a date is typed in "Rec by", that one is used.
Not reached — late also includes older parcels not yet marked received.
Excel has one line per parcel, with a link to the receipt photo. Data stays in cache for 15 minutes.
Packing & Dispatch
Order by order: how much was made, packed, dispatched, is still in WIP, wasted and put into stock. Pick dates to see one day, week or month.
Screen · PDF · Excel
Dates
Call Report
Calls of every staff phone: how many a day, how long, who is quiet
Screen · PDF · Excel
Accounts Checklist MIS
Each accounts duty: done or not done, and the action taken
Screen · PDF · Excel
Sale Book
Each month's sale against target, item by item — amount and metres
Screen · PDF · Excel
Monday Review
Last week on one page — on-time delivery, store, help tickets — and the plan for this week
Screen · PDF
Winder Plan vs Actual
Soft Winder and Final Winder: plan against actual, count by count (kg and m), day by day — with %
How many machines ran, how many stopped — day, week and month — and where to send the mechanic first
PDF (print) · Excel
Week = the 7 days up to this day. Month = from the 1st to this day.
Quick pick
What is in this report?
Machine-wise Production entries (Status: Running / Stop; Braiding / Crochet from Braiding & Crochet Production), the same "Stop" rule. First page: day, week and month:
how many machines ran, how many stopped. Then Send the mechanic here first — the machine stopped continuously for the most days,
with when it last ran and what the Reason / Remarks say. Then all stopped machines, and those running now but
stopped for 3 or more days this month. If today's entry is not made yet, it shows the last day that has an entry.
Excel has one line per machine and an R / S chart for every day. Data stays in cache for 15 minutes.