Jairoop

Braiding & Crochet Production

← Back to Main
📌 How to fill
Act Qty (m): the metres that head / group made that day — type that figure. A box marked auto fills by itself (grey). Braiding: one machine runs only one design / yarn / size in a day, so type the Order No. and RPM once on the machine line above the heads — the order brings its Party, Size and Yarn by itself and puts them on all 4 heads (there is no Design No. in Braiding). On each head line: Colour, Act Qty, Status, Remarks and Reason (one head = 1 tape). Crochet / Rashal: every box on one line of the machine. Start with the Order No. (type it, or pick it from the list of running orders) — its Party, Colour, Size (mm) and Yarn come by themselves (they can be changed; there is no Design No. in Crochet); then Rubber, Tapes, RPM, Pl Qty, Act Qty. If tapes of a different colour / size / order are running on the machine at the same time, press + Group to make a separate line below (e.g. 3 White + 2 Dark grey = 2 groups) — a new group takes the order no., party, size, yarn and rubber from the group above, so type only the colour (or type that colour's own order no.). Tapes: type how many tapes are running (it does not come by itself; Same as yesterday copies it). Type the Act Qty of all the tapes of a group together. The machine total adds up by itself. If one tape has several colours, add them with the + beside the Colour box, e.g. Red + Yellow + Green. Order No.: the list has every running order of the department from Order → Dispatch (with its party, colour and size). Picking or typing an order fills its Party, Colour, Size and Yarn (the order's Thread; when the order has none, the yarn of the machine's product in the Design master) into the boxes that are empty or still hold an earlier order's details — a box typed by hand stays, and the orange line under it says where it differs from the order. An order that is not in the list can be typed as well (orange "order not running" — it still saves); when that order is written on a Design master line (its Order ID box), its Party (the line's Customer), Colour, Size, Yarn and Rubber come from that line. The Party list is the Sample CRM's customers; typing a party first still works (its only running order of that size is picked by itself). As soon as Act Qty is typed, the Status becomes Running. If any group of a running machine has a blank Act Qty, that line is not saved ("Act Qty pending"). If nothing was made, type 0. If the machine is stopped, pick Status Stop and the reason in the last box Reason, e.g. Maintenance; if the reason is Other, write in Remarks what happened. If it ran for a while during the day, Act Qty can be typed with Stop too. Pl Qty comes by itself (Braiding and Crochet the same way): from Settings → Norms (machine + size), or from the Design master line of that product + size, or — when the product has only one production per hour in the Design master — from that rate for every size (m per hour × hours per day); if there is none and the plan is known, type it yourself. Pl Qty of a group = plan of one tape × tapes. % = Act Qty ÷ Pl Qty − 1: −10% = 10% short of plan, +5% = 5% more than plan, 0% = exactly on plan. Same as yesterday fills, only in the open department, the empty boxes of every machine with the order no. / party, size, colour, yarn (Crochet: rubber, tapes too) and RPM from its last entry (and for a group whose Pl Qty does not come by itself, its Pl Qty from yesterday too) — Act Qty you have to fill. Stop is not copied: pick the Status and Reason of a stopped machine every day. Press Enter to go to the same box on the next line. See a saved entry in the Records tab (Analysis and Average too) — it opens on the Machine-wise Production page, where all departments are together (Crosia, Braiding, Crochet and the rest); pick the department with the filter there.
MachineOrder No. / PartySize (mm)Yarn / RubberColour TapesRPM Pl Qty Act Qty% StatusRemarksReason
Loading…