Tasks the doer has submitted as Completed stay here until they are verified. On Reject, the same task is assigned to the doer again under a new Task ID (WhatsApp goes out too). The verify link also goes to the MD's WhatsApp.
ID
Doer
Task
Target
Completed
On Time?
Doer Remarks
Decision
Name
Mobile
Designation
Department
Email
Status
Doer
Task
Every
Next one
Made
In hand
To verify
Verified
Missed
MIS
Status
Doer
Assigned
Due
Completed
🟢 On-time
🟡 Revised 2×
🔴 Revised >2×
Overdue
⏳ Carried over
🔴 Ignored
Flag
MIS %
Score formula (out of each doer's Due tasks — the ones whose first target date has passed) — 🟢 On-time: completed by the target date (count + %); 🟡 Revised 2×: tasks the doer pushed forward twice (count + %); 🔴 Revised >2×: pushed more than twice (count + %). 🔴 Ignored = how many TASKS were left unanswered on a reminder after the target date — one task counts once, however many mornings it goes on. (How many times it happened is shown in small type below; the ones before the target date show separately as "free".) Flag: any task revised >2× = RED, any 2× = YELLOW, otherwise GREEN.
MIS % — every task is worth 1 point, and the MIS % says how much of that was lost. It is therefore always a minus; a clean 100% reads as 0%.
• Nothing is judged before its own deadline. An open task whose target date has not passed is in hand — it is in neither half of the sum, so it can neither help nor hurt. The owner's rule, 31-Aug-2026: the −100% starts only once the target date is crossed.
• A revision moves the deadline, not the score. The score is always built on the first target date (the one given when the task was created). You may do the work by the new date — the reminders and the red marks run on the new date — but a date that has passed has passed. Each revision already cuts 25% of the point; it no longer buys the miss back either. If the date was changed not by you but by somebody else (an admin) — that is, there is no revision record at all — then the score is built on the new date, because that change was not yours.
• Due but not completed → the whole point is gone (−100%). A task nobody ever opened the form for — neither Done nor Revised, and a reminder already ignored after the date — is counted as Missed. It costs exactly the same; the separate name is only so you can see whether the work is still in hand or being ignored.
• Completed but revised → 1×: 25% less · 2×: 50% · 3×: 75% · 4× or more: the whole 100%. A revision moves the deadline, which is why it is not free.
• MIS % = (total points ÷ total Due) − 100%. Example: 2 of 10 due tasks completed clean = −80%. A rejected task earns nothing; the task re-issued in its place earns its own point.
• Hover any MIS % to see the whole arithmetic for that person.
Why this score
ID
Task
Target
What happened
Earned
Lost
Reminders go out on their own every morning at 8:00 AM (each task on its own frequency — Daily / Every 3 days / Weekly / Every 15 days / Monthly).
Verification (MD) Settings
Holidays
Assign New Task
Add repeating task
The task is made by the 8 AM check on
its own day, and the doer is told that same morning — one message with everything he is due, not
one per task. A weekly task is due by that week’s Saturday; a 15-day one by the end
of its own round (14 days); a daily one the same day. A 15-day rule is counted from the
Start date, not from a weekday — 15 is not a multiple of 7, so its day walks, and a round
pushed off a Sunday does not move the ones after it. Sunday is never used — a daily or
15-day task rolls on to Monday, and no reminder goes out on a Sunday at all. The previous one, if it was never done, stays on the board and keeps its zero
in the MIS, but stops ringing his phone.